Annual Report 2010 Annual Report 2010

East Rand

Evander

Evander

Geology

The Evander Basin is a tectonically preserved sub-basin outside the main Witwatersrand Basin and forms an asymmetric syncline, plunging to the north-east. It is structurally complex with a series of east-north-east striking normal faults. At the south-east margin of the basin, vertically to locally overturned reef is present. The only economic reef horizon exploited in the Evander Basin is the Kimberley Reef. The Intermediate Reef is generally poorly mineralised, except where it erodes the sub-cropping Kimberley Reef to the south and west of the basin.

Gold – Mineral resources

 MeasuredIndicatedInferredTotal
OperationsTonnes
(Mt)
g/tGold
(000 kg)
Gold
(000 oz)
Tonnes
(Mt)
g/tGold
(000 kg)
Gold
(000 oz)
Tonnes
(Mt)
g/tGold
(000 kg)
Gold
(000 oz)
Tonnes
(Mt)
g/tGold
(000 kg)
Gold
(000 oz)
Underground
Evander 83.714.02521 6593.615.51561 80512.411.131384 44619.712.472467 910
Evander 90.113.692500.113.991310.611.5772400.812.0710321
Total3.8 14.2541 7093.7 15.48571 83613 11.151454 68620.5 12.462568 231
Projects - Below Infrastructure             
Evander South23.95.351284 10740.43.081254 00664.33.922538 113
Rolspruit29.111.5933710 8474.95.692890234.010.7436511 749
Poplar17.29.281595 12317.29.281595 123
Total 70.2 8.9062420 07745.3 3.361534 908115.5 6.7377624 985
Subtotal3.8 14.01531 70973.9 9.2368121 91358.3 5.112989 594136 7.591 03233 216
Surface
Libra Project202.90.29591 897202.90.29591 897
Total 202.9 0.29591 897 202.9 0.29591 897
Grand total3.8 14.01531 709276.8 2.6874023 18058.3 5.112989 595338.93.22 1 09135 113

Modifying factors

OperationsMCF
(%)
SW
(cm)
MW
(cm)
PRF
(%)
Evander 87412016996
Rolspruit8011013795
Poplar7011013995
OperationsMCF
(%)
PRF
(%)
Libra Project10045
  • MCF = Mine call factor
  • MW = Milling width
  • SW = Stoping width
  • PRF = Plant recovery factor

Evander: Grade tonnage curve

(measured and indicated resources)
Evander: Grade tonnage curve

Gold – Mineral reserves

 ProvedProbableTotal
OperationsTonnes
(Mt)
g/tGold
(000 kg)
Gold
(000 oz)
Tonnes
(Mt)
g/tGold
(000 kg)
Gold
(000 oz)
Tonnes
(Mt)
g/tGold
(000 kg)
Gold
(000 oz)
Underground
Evander 82.27.20165201.69.12154703.88.0031990
Total2.2 7.20165201.6 9.12154703.8 8.0031990
Projects - Below Infrastructure         
Rolspruit26.28.082116 79026.28.082116 790
Poplar16.15.99973 10516.15.99973 105
Total 42.3 7.283089 89542.3 7.283089 895
Subtotal2.2 7.201652043.9 7.3532310 36546.1 7.3433910 885
Surface
Libra Project202.90.29591 897202.90.29591 897
Total 202.9 0.29591 897202.9 0.29591 897
Grand total2.27.2016520246.81.5538212 262249.01.6039812 782

Section across Evander Basin

Not to scale
Section across Evander Basin

Evander operations

Evander 8 shaft and 9 shaft, Poplar, Rolspruit and Evander South – Kimberley reef
Evander operations

HARMONY ANNUAL REPORT 2010