Unisel

  FY14 FY13 FY12
Number of employees      
– Permanent employees 1 809 1 845 1 823
– Contractors 148 143 100
Total 1 957 1 988 1 923
Operational      
Volumes milled (000t) 408 446 394
Gold produced (kg) 1 838 1 813 1 593
Gold produced (oz) 59 093 58 289 51 216
Grade (g/t) 4.50 4.07 4.04
Productivity (g/TEC) 85.33 82.24 74.70
Development results      
Total metres 5 641 6 380 5 522
Reef metres 3 462 3 514 2 584
Financial      
Revenue (Rm) 792 825 672
Average gold price received (R/kg) 432 072 457 160 422 867
Production profit/(loss) (Rm) 192 258 177
Capital expenditure (Rm) 85 78 71
Cash operating cost (R/kg) 326 466 315 136 312 957
All-in sustaining cost (R/kg) 397 993 388 617 374 519
Safety      
No of fatalities 0 1 1
Lost-time injury frequency rate per million hours worked 11.66 12.27 15.83
Environmental      
Electricity consumption (GWh) 110 111 110
Water consumption – primary activities (ML) 711 1 431 2 146
greenhouse gas emissions (000t CO2e) 109 110 109
Intensity data per tonne treated      
– energy 0.27 0.25 0.28
– water 1.74 3.21 5.45
– greenhouse gas emissions 0.27 0.25 0.28
Number of reportable environmental incidents 0 0 0
Community      
Local economic development (Rm)* 12 16 3
Training and development (Rm) 14.7 13.1 12

* Included in the total for FY14 is an amount of R8 million that was capitalised as part of the hostel upgrades

A consistent and profitable mine, Unisel is nearing the end of its operating life. An emphasis on clean mining practice and the mining of high-grade panels contributed to improved grade recoveries and an increase in production year-on-year. This production increase occurred despite the challenges posed by a reduction in face length per panel and in crew availability. A recent increase in seismicity in one section of the mine necessitated a change to the regional support layout, resulting in reduced face length.